10/25 – Team Meeting
- Design Options:
- Fixed horizontal or manual adjustment
- On roof or not
- Inverters
- Wall Charger or Generator for consecutive days
- Round the 3.02 panels to 3 panels because rest of design has been over-engineered
10/25 – Meeting with Brian McKeon
- Motor FLA (full load average), in-rush power generally 6 times FLA, up to 10-12
- Most breakers can only handle 80% rated current for continuous load (3 hours)
- Disconnect panels from inverter since panels can’t be shut off. Use quick disconnects rated for make-break
- Might need grounding rod for grounding. Check if this applies to mobile/low power. Will need to at least ground to trailer chassis
- DMV/DOT regulations apply when panels are attached to roofs
- Can put panels on a sheetrock jack if they’re not attached to the roofs
- #12 AWG wire is ~$0.07/ft versus #4 is $0.40/ft
- Must have short circuit & fault current protection
- Don’t need to protect each piece of equipment
- Ask if inverter receptacles are horsepower rated