9/19 – Team Meeting
- Decided to go with fixed panels instead of tracking – must consider how much power is needed to move panels vs. how much load we have
- Manually adjustable or 100% fixed
- Can buy controller for between batteries and panels
9/20 – Meeting at HMF
- Events St. Patrick’s Day to December
- Trailers have weight capacity that we need to consider
- Ideally, have trailers ready for St. Patrick’s Day
- Currently use 4 x 2 kW generators and car battery with inverter for power
- 29 other races are not marathons, Eversource marathon is the only marathon and it is unrepresentative of their events
- “Can” trailer goes to race basically empty, comes back w/ cans, goes to the 2nd most events
- 4 triathlons every year, equipment for that stays in 16’ trailer all year
- Power at least 1 speaker, often 2, at every race
- At minimum, plug on outside of trailer for Arch air blower motor
- Can trailer near registration, 20’ trailer at finish line
- 4-8 laptops (they own 10) used at registration. 1 car battery can power those PCs
- Rent a solar trailer for the Marathon – Consolidated Solar in PA
- Glastonbury Transfer Station can measure the weights of the trailers
- Budget is around $5000, but sponsorship is likely
- 5k and triathlon events start at 4:30-5:00am and go until 10:30 – about 6 hour run time
- Half Marathons are 9 hours from setup to break down
- The Marathon is 12 hours from setup to break down
- 20’ trailer enclosure dimensions: (WxLxH) 102 x 245 x 86 in.
- 12’ trailer enclosure dimensions: (WxLxH) 73 x 150 x 77 in.