Week 14 (1/22/17-1/28/17)

1/23 – Meeting with Dr. Bazzi

  • Check with 1) Pete Menard and 2) Peter Glaude for crimping tools
  • Mansfield Supply or Autozone may have DC wire terminals
  • Yes, implement DC breakers on both sides of the charge controller
  • Possibly have a cabinet for all breakers and distribution
  • Using a mirror on Demo Day so that vewiers can see atop the trailer
  • Don’t use the term “over-engineer.” We simply provided room for expansion and built for worst-case scenario
  • Remember to have HMF electrician check trailer before first event